Assessing and Identifying On-Site Labor Cost Challenges and Necessary Control Measures in Iraqi Construction Projects: A Case Study Approach
M. N. Mohammed, Rahmani Lalmi, Mohammed Taher, Muhsin J. Jweeg, Hakim S. Sultan Aljibori
The average shows from 3 ratings.
Click dots and donuts to bring up details or select a country/territory from the list
Weighted concepts mined from titles, abstracts and topics of the research output, grouped by field.